- ProjectPrivate residence, north-west London
- ScopeSpecialist staircase, balustrade and stone package
- SettingLive site, alongside other trades
The situation
We were delivering the specialist staircase, balustrade and stone package on a coordinated programme, working alongside other trades.
What we identified
During site coordination, ceiling and soffit work by others left the finished half-landing with insufficient headroom. Left as it was, the arrangement risked falling short of the applicable staircase guidance and needing disruptive rework later.
What we did
We stopped work at the affected location, raised the issue with the project team and required correction and remeasurement before installation continued. Our work was sequenced so that the staircase could stay in use as a route through the building while the correction was made.
What this demonstrates
Identifying a compliance issue through practical measurement, declining to build onto an unsuitable interface, coordinating with other trades, and treating sequencing as part of a safe solution.
Client and project details are kept confidential. Measurements and records are held on our project files.
More cases
Facing something similar?
If you are looking at a staircase, guarding or buildability problem, or want a second pair of eyes before work is committed, the first conversation is free and without obligation.
Start with a conversation
Tell us what you are dealing with. If we can help, you will receive a written scope and fee proposal before any chargeable work begins.